成人免费毛片aaaaaa片丨日韩香蕉网丨大尺度一区二区丨久久天堂综合亚洲伊人hd丨午夜福利一区二区三区在线观看丨亚洲夜夜叫丨欧美青草视频丨av男人的天堂在线丨无码专区视频中文字幕丨麻豆免费观看视频丨国产免费又爽又色又粗视频丨激情av小说丨成人mv在线观看丨亚洲仺av香蕉久久丨成年女人色毛片丨免费看黄色一级视频丨国产精品30p丨青青视频免费丨亚洲xxxx3d丨亚洲sm另类一区二区三区丨精品欧美一区二区精品久久丨国模小黎自慰337p人体丨911国产丨国产免费久久精品99久久丨青青青国产

    新聞中心

    山東裝載機(jī)輪胎更換的方法是啥?

    更新時(shí)間:2016-12-26 10:18:56 點(diǎn)擊次數(shù):2917次
    啟動(dòng)山東裝載機(jī),就近尋找一塊比較平坦開闊的場地,壓下動(dòng)臂升降桿,利用動(dòng)臂支承使前輪離地,然后用支架支撐在閃橋靠近爆胎的一側(cè),并將后輪楔好。


    1.啟動(dòng)山東裝載機(jī),就近尋找一塊比較平坦開闊的場地,壓下動(dòng)臂升降桿,利用動(dòng)臂支承使前輪離地,然后用支架支撐在閃橋靠近爆胎的一側(cè),并將后輪楔好。Shandong boot loader, find the nearest one site is relatively flat and open, under the pressure of the boom lifting rod, the movable arm supporting the front wheels off the ground, and then use the support in the bridge near the tire side flash, and rear wheel wedge.

    2.利用撬杠等等工具,拆卸擋圈及鎖圈然后檢查輪胎襯墊與輪輞外表面是否粘連。若發(fā)生可撤掉支撐物,使山東裝載機(jī)在短距離內(nèi)慢速往復(fù)運(yùn)行,直至襯墊與輪輞外表面脫離;嚴(yán)禁轉(zhuǎn)向和高速行駛,以免損壞內(nèi)胎。然后,前輪重新支撐起來。Use a crowbar, and removing the retainer ring lock ring and then check the tire and rim liner outer surface adhesion. If there can be removed support, make Shandong loader running slow reciprocating within a short distance, until the liner and the outer surface of the rim from the forbidden; steering and high speed, so as to avoid damage to the tube. Then, the front wheel to prop up.

    3.將山東裝載機(jī)內(nèi)、外胎的相對位置作好標(biāo)記,以便查找、清除異物和修補(bǔ)輪胎。The relative position of Shandong, the loader tire mark, in order to find and remove foreign bodies and tire repair.

    4.利用撬杠等工具,將山東裝載機(jī)輪胎從輪輞上拆下。注意,動(dòng)作要輕柔配合要默契,避免被輪胎砸傷,并且要保護(hù)好氣門嘴。Use the crowbar and other tools, will Shandong loader from tire rim removed. Note that the action should be gentle with the tacit understanding, to avoid being injured and protect the tire, aerobic door mouth.

    5.山東裝載機(jī)外胎被釘子等細(xì)長異物扎傷后,若表面無明顯創(chuàng)口或創(chuàng)口較小,則此外胎可繼續(xù)使用(因?yàn)檠b載機(jī)輪胎屬低壓胎,且運(yùn)行速度比較慢);若創(chuàng)口較大,則必須進(jìn)行修補(bǔ)(因?yàn)闄C(jī)器運(yùn)行時(shí),輪胎受擠壓磨擦,時(shí)間一長就會(huì)損壞內(nèi)胎,甚至創(chuàng)口越來越大、內(nèi)胎突出,造成輪胎報(bào)廢)。Shandong tire loader is slender nail foreign body after injuries, if the surface has no wound or the wound is small, the tyre can continue to use (because the loader is a low pressure tire tread, and the running speed is relatively slow); if the wound is large, it must be repaired (because when the machine is running, the tire friction would be squeezed, long time tube damage, even more and more prominent, the wound tube, causing scrap tire).

    6.若是新內(nèi)胎,必須將氣門嘴底部的螺栓擰緊,以防漏氣;然后將外胎內(nèi)腔的異物清除,并撒入適當(dāng)?shù)幕郏磕ň鶆颉榱耸挂r墊與內(nèi)、外胎貼緊,在山東裝載機(jī)裝入內(nèi)胎后應(yīng)給內(nèi)胎適當(dāng)充氣,再塞入襯墊。If the new tube, must tighten valve at the bottom of the bolt, to prevent leakage; then the tyre cavity foreign body removal, and sprinkle with appropriate talcum powder, evenly. In order to make the inner liner and tyre tightly, loader into the tube in Shandong should give appropriate air into the liner tube, then.

    7.將山東裝載機(jī)輪胎裝到輪輞上,裝上鎖圈、擋圈;安裝過程中要保護(hù)好氣門嘴。Shandong loader tires mounted on the rim, fit a lock ring and the retainer ring; the installation process to protect the aerobic door mouth.

    8.用車載空壓機(jī)給山東裝載機(jī)輪胎充氣。Charging of Shandong loader tire with vehicle air compressor.

    9.壓下動(dòng)臂升降桿,取出支架;至此山東裝載機(jī)換胎完畢,整個(gè)過程大約需要50min。更換后輪胎時(shí),則需要另一臺(tái)山東裝載機(jī)或者其他起重設(shè)備輔助,將后輪胎支撐起來,其他程序則與更換前輪胎相同。Out of the bracket arm lifting rod, under pressure; thus Shandong loader tires is completed, the entire process takes about 50min. Replacement of the tires, you need another Shandong loader or other lifting equipment auxiliary, the rear tire support, other procedures and replacement of the same tire.